Cross icon

Green Methanol Production
Reliable. Certified. Carbon-Negative.

Our patented systems convert waste into low-emission green methanol—ready for shipping, aviation, and industrial fuel markets.

Download Spec Sheet
Submit Expression of Interest
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Pipeline Overview
Capacity Pipeline → 500 Million Litres
735m CO₂
Modular Green Methanol Plants for Industrial Scale
Patented Green Methanol Process
Our methanol is drop-in ready for marine fuel, chemical production, or as a precursor for Sustainable Aviation Fuel (SAF)—with global demand already secured across multiple sectors.
Strategic Co-Location Model
Pipeline-Ready Project Model
Be Part of the Green Methanol Pipeline
At AER Energy, we are actively building a 500 million litre pipeline of green methanol production capacity—anchored by offtake demand and backed by patented, carbon-negative technology.

Whether you're a government agency, industrial operator, investor, or shipping company, we’re inviting expressions of interest to co-develop, co-invest, or secure long-term supply.

This is your opportunity to shape the next wave of clean fuels infrastructure.
Register Your Interest
FAQ
What is green methanol?
Chevron arrow down
Green methanol is a clean-burning liquid fuel made from renewable feedstocks like biomass or municipal waste, instead of fossil gas or coal.
How is your green methanol carbon-negative?
Chevron arrow down
Our syngas is produced via a patented autothermal gasification process that sequesters carbon. Combined with BECCS and no fossil inputs, the full lifecycle is net-negative.
Learn more from Maersk
Is this methanol certified?
Chevron arrow down
Yes, we design all production systems to align with RED II, ISCC, and RFNBO standards for marine and aviation fuels.
Can I co-locate this with existing biomass supply?
Chevron arrow down
Absolutely. The system is modular and performs best when installed close to feedstock sources.
What is your timeline to production?
Chevron arrow down
We are currently commissioning our first commercial facility. The rest of our 500M litre pipeline is open for early partnerships and co-development.